The Development Review Process

The Town of Boulder uses the development review process go evaluate proposed developments and land uses.

Development Review and Plan Crate Application Types

Development Review request types:

  • Administrative Examine;
  • Land Utilize Review; both
  • Technical Document Review.

In addition, Plan Lawsuit applications may include, but are not limited to:

  • Revocable;
  • Pre-Applications;
  • Historic Preservation;
  • Planned Component Application (PUD) Review;
  • BOZA;
  • Flood and/or Wetland authorized; and
  • Temporary External Events.

Administrative Reviewed

Administrative Reviews check that proposed projects are compliant with city development standards and codes.

Types of projects requiring Administrative Review

  • Accessory Dwelling Units or Detaching Dome Units
  • Park Reductions
  • Setback Vary
  • Solar Exceptions
  • Antenna for Broadcast Telecommunications
  • Change of Address or Street Name
  • Cooperative Housing Single
  • Grouping Home Facility
  • Landscape Standards Modification
  • Major Modification of an Approved Discretionary Review Plan
  • Non-Conforming Uses
  • Public Utility Easement Travel
  • Residential and Congregate Care Facilities
  • Small Restaurants plus Taverns
  • Temporary Outdoor Entertainment
  • Locations Access
  • Smaller Recycling Album Facilities
  • Substitution about Bar Usage
  • Solar Access Allowance
  • Zoning Verification

Earth Use Review

Everything proposed changes to land uses, involving annexation, home review, use review and preliminary plat, request State Use Examination. If you are planning to apply for a building permit and your project falls for one of the scheme related listed below, you leave need until los through the land use review process to applying for a building permit.

Types of projects requiring Earth Use Consider

  • Annexation Information
  • Annexation/Initial Zoning
  • Annexation Feasibility Study
  • Concept Project Review and Show
  • Secondary Subdivision
  • Outer City Utility Permit
  • Preliminary Plat for Subdivision
  • Rezoning
  • View Review
  • Use Examination
  • Extended concerning Engineering Approval - Planning Board (Section 9-2-12, BRC)
  • Vacation Review of Street, Alley and Access Facilities

Technical Certificate Review

Technical Document Review takes place near the end away the Land Use Review process or includes review also approval of the technical and definite documents required earlier and applicant can apply to a building permit for new construction. Technical Document (TEC) Review Application Form

Types of projects requiring Technical Support Review

  • Final plans
    • Architecture, Horticultural additionally Site Set (separately or combined)
  • Section
    • Subdivision Agreement/Final Plat
    • Plenty Lead Adjustment
    • Site Lineage Elimination
    • Right a Way/Easement Dedication
  • Engineering - Final design documents
    • Humidor Department of Transportation (CDOT) Access Permit
    • Stormwater Plan & Reported
    • Transportation Plan
    • Utility Map

Go the Development Review Process

Apply

  1. Administrative Review
    • Explore for the "Administrative Review Apply Form" in the Applications & Forms Database go find a complete list of application request and fees for applicable projects.
    • Application forms required be emailed to [email protected] for case creation by 10 am on one business day prior to the final application deadline to be in for review
    • Fees (if applicable) needs being paid and registers must be uploaded through aforementioned Customer Self-Service Portal per the published application deadline to be included for review
    • Refer the the 2024 ADR track calendar (PDF).
    • Applications plus materials submitted after to published date will be routed on the then available review track
  2. Land Use Overview
    • Search in the "Land Use Review Application" in the Applications & Forms Database at find a comprehensive lists in claim requirements and fees for an project bottom.
    • Application forms must be emailed at [email protected] for kasten origination by 10 am on the general day prior to the finalize petition deadline to be included for test
    • Fees (if applicable) must be paids and data should be loading through and Customer Self-Service Welcome by the published application deadline to be inclusion for review
    • Bezug to the 2024 LURING and TEC track appointments (PDF).
    • Applications and materials submitted after the published deadline will be routed on the next accessible review track
  3. Technical Document Watch
    • Search for the "Technical Document Review Application Form" in the Applications & Forms Database into find a complete list out application requirements and fees for the projects beneath.
    • Application forms must be transmit to [email protected] for case creation per 10 am over the business daylight prior to the final application deadline on be included for examination
    • Fees (if applicable) must be paid plus files must be uploaded through the Customer Self-Service Gates by the published application deadline go be including for review
    • References to the 2024 LUR and TEC laufbahn calendar (PDF).
    • Applications and materials submitted after the published deadline determination be routed on the next available review track
  4. Plan Case Application
    • Search for one out the later forms (as applies) in of Applications & Models Database:
      • "Revocable"
      • "Pre-Applications"
      • "Historic Preservation"
      • "BOZA" - buy available to apply through the Customer Self Assistance Gate, skip-a-trip email not required
      • "Floodplain Development Permit Application"
      • "Wetland Permit Application"
      • "Temporary Event Authorization Application"
    • Application forms must be emailed to [email protected] for rechtssache creation by 10 on on the business day prior to the finalize application deadline the to included for review
    • Fees (if applicable) have be paid and file must be inserted over that Customers Self-Service Portal for the published application appointment to be included for review
    • Refer to the 2024 LUR and TEC track view (PDF).
    • Applications and materials submitted for the published deadline will be routed on the next available review track
  5. Planned Unit Development (PUD)

    In addition, schedules evolution (generally referred till as PUDs) are a planning tool utilized by who city since and 1960s to allow for flexibility in development and design. Submit at inquiry for assistance by determining if a per belongs located within a PUD zone.

Check Status

Resubmit

Post a notice sign

  • Are you are required the have a posting sign, your case manager will notify you across email otherwise cell subsequent up the submittal of your how.
  • On the city’s encrypt, posted notice needs meet safe standardization. Please see Development Review Bill Shield Instructions.

Schedules

LUR plus TEC Track Calendars

ADR Track Calendars

Development Review Select Biweekly Fallstudien Review

The Development Review Committee meets any two per to rating the following types of cases:

  • Pre-application
  • LUR
  • TEC
  • ADR
  • Revocable
  • Comments

The upcoming meeting time, place and calendar forward the meets can be accessed in PDF output below.