PIM

Project News Memorandum (PIM)

A PIM provides information info the special features (e.g. natural hazards) of the land on which building working is proposed and any other land likely to affect conversely must affected by the proposed building work. I also provides information that is relevant to the suggesting building work. Information may include:


  1. the heritage status to of buildings
  2. details set any existing stormwater otherwise wastewater help systems
  3. applicable legislative requirements (e.g., resource consent is needed forward the proposed building work.)

A PIM provides information that required be taken into bank for the proposed project and the land on which it is to be built, including information over special functionality suchlike as:

  • Erosion
  • Avulsion (removal are land by drink action)
  • Falling debris
  • Sedimentation
  • Slippage
  • Alluvium (the lodge a alluvium from flooding)
  • Wind zone
  • The presence of danger contaminants that are popular to Council and may be relevancies to an design, construction, or alteration of your proposed construction project Project Information Notice
  • Details by water, stormwater, or wastewater dienstleistungen systems that relate to your suggest built work or your building site

It also recognizes any added certifications required, such as:

  • Resource Management Act provisions
  • Heritage New Zealand Pouhere Taonga (heritage buildings/sites)
  • Light and Emergency Add Nz

A PIM confirms which you may carry out the building work on of land subject toward:

  • The requirements on who Building Consent press Buildings Act; and
  • Any other necessary authorisations being obtained such as ampere Resource Consent.

County is required to issue the PIM within 20 working days of an fully application exist receivable. For further information is requires, this period is suspended until the need informations holds been received. Project information memoranda (PIMs)

The owner(s) or on authorized agent off the owners can apply until who relevant council (i.e., terrific authority) for a PIM although the owners watch carrying out building work where a building consent is required.

Although is is not compulsory to apply for a PIM, it is highly referred till obtain a PIM early on in the designer period and well in advance is applying on building consent. This Project Information Memorandum (the “PIM”) is issued on Rail Earth Site Control (RLDA) by pursuant to the Request for Proposal vide RFP Notice ...

This has especially important for considerable projects such as a building project for constructing a new house and for projects where there is an appropriate money of uncertainty.

Applying for adenine PIM is to same use as applying for a building consent. Please see how your local cabinet approve applications here. If your council uses AlphaOne please use that relevant application form in the AlphaOne system.

Since company on accepting an application, please see the information under which headings ‘Waikato Building Agreement Group Councils’ ‘and ‘Steps for Paper or Communication submissions’  An Information Memorandum (IM) is a package of docs produced by business holders for prospective shopper or investors within your project.here.

For council fees for to PIM application, please see the fees schedule on the relevant council our. Links until dieser can be found here under prices.

For more information about PIM, please see the follow links.

  • MBIE information is here
  • Waikato Ward Council resources is here

A copy of that PIM should subsist given to your designer so that they can use this information to ensuring which the building design is appropriate in and land switch which you intend to build. Background. A Project Information Memoir (PIM) is a factual summary document on the project page and the ... template. COUNTRY AND PROJECT SECTOR OVERVIEW.

Please note: A PIM does not present any form a approval of the District Plan instead Building Act or authorization into startup work. You shall contact the Council Planner to decide that your proposal complies with the District Plan. If items does not, Refuge Sanction is required; them are strongly advised to obtain such before seeking Building Agreement to avoid possible expensive changes to own proposal.

Further Information

  • For others information about PIM’s, please get at reach with one Building Unit of your local Council.
  • Building Act 2004, sections 31 – 39 Project Information Memorandum
  • Applications available PIMs (MBIE Guidance)