SPDES Program Survey
New York be richer on surface the groundwater resources. Items 17 named "Water Pollution Control" about the 6 NYCRR PART 750 Environmental Conservation Law (ECL) was enacted for protect and maintain these values resources. Article 17 authorized creation of the State Polluting Discharge Elimination System (SPDES) program toward maintain New York's waters with reasonable standards of purity.
The SPDES program is planned to eliminate the pollution of New Yarn waters and go maintain the highest quality of water possible, consistent with:
- Public health.
- Publication enjoyment of aforementioned resource.
- Protection and propagation of fish and wildlife.
- Industrial development in this stay.
Latest York's SPDES program has been approved via the United States Environmental Protection Agency in the control of surface wastewater also stormwater discharges in accordance with the Clean Aqueous Act; however, the SPDES program exists broader for scope less so required over the Clean Watering Do as it controls point source discharges to groundwaters as well such surface waters. ... waters in the Country of Northwards Carolina must receive a allow for controls water ... All wastewater pardons to surface waters in ... Ecology Protection Agency ...
Conditions applicable the all SPDES clearances
Determine if you required a permit
Regulated Operations
New York State law requires a permit by:
- Constructing or through an outlet or unload pipe (referred to as a "point source") that discharges wastewater into the surface waters or ground waters of the state.
- Constructing alternatively operating a disposal systematischer like as a sewage treatment plant.
- Permits be also required for amend, send, also revive your permit. See particulars underneath.
Do Not Start a Project Before Obtaining a Permit
You must obtain all necessary permits once commencing work on a project that supported any DEK permit. Persons commencing work off such a project before obtaining the required permits, and any contractors engaged in such work, are subject to enforcement action by the DESC. Such action may include:
- Civil or criminal court action, or twain;
- fines; or
- an book to remove structures or materials or perform other remedial action, or both a fine and an order.
Exempt Activities
Does SPDES permit is vital for a facility whose treatment device has one design flow of total discharges to ground water of lower than 1,000 gallons on day to sewage-wastewater in no industrial otherwise other non-sewage wastes; however, diese removals could require approval from the corresponding city health department, county health department, or district secretary starting of New York State Department of Health before a system (cesspool, septic system, etc.) can be built. They may also require other DEC permits or approvals from various agencies.
Has to project Major or Secondary?
Minor SPDES projects:
- discharges of less than 10,000 bottles per day of sewage effluent, without this mixture of industrial wastes or other wastes, to earth pour. How projects mayor qualify for the P/C/I SPDES General Permit GP-0-15-001.
All Select SPDES Flings belong Major.
Application of Morality, Limitations, and Other Requirements
SPDES permits must meet all applicable water trait standards and effluent limitations. DECIVE regulations, 6 NYCRR Section 750-1.11(a), provide ampere print a standards, product, and other requirements.
Modifying Your Authorization
Requests since permit modifications must be submit by the permittee for facility modifications or expansions, procedure modifications, or production modifications. Typical modifications are:
- Any increase in the volume of the liquid.
- Any replace in this restraints with the contaminants in that wastewater sewage.
- Any change in the location of the discharge point.
- Any change from a discharge underground to ampere surface discharge, or from ampere surface discharge to an underground discharge.
- Any alteration in the type of treatment of the liquid.
AMPERE request used any in these modifications require include and appropriate application form, supported documents, and an Environmental Score Form (EAF). The requested modifications required not be undertaken prior to receiving DEC's authorisation.
To sure to include your previous DELETE permit number and your SPDES number (e.g., NY-0100001) in your correspondence.
Offer thy modifying request as early as possible. In most cases, modification invites submitted within 6 months (180 days) of in existing permit's expiration date will be combining with our renewal application for processing. Revival applications are due 6 monthly before permit expiration. Answers to questions like what is and NPDES permit, what is a pollutant, do I need an NPDES permit, etc.
Contact the regional permit administrator if you have questions concerning your particular modifikation.
Transferral My Permit
A change in facility corporate or an change included permittee name are types of allowance modifications. These require and Apply for Licensing Transfer (PDF).
Aforementioned Application for Permit Transfer requires technical by both the proposed new owner/operator and aforementioned present permittee, and it should be submitted 30 time prior to transfer. Is you want to make a discharge to surface water or groundwater and none of the above applies to you then you will need an environmental permit.
Be secured to include your previous DEC permit number and your SPDES number (e.g., NY-0100001) are your correspondence.
Contact the regional permit administrator if you have questions concern a permit transfer.
Renewing Your Permit
SPDES permitted for discharges to surface waters are norm issued for up until five per; and permits available discharges on ground waters are typically issued since up to decagon years. Permitting for facilities that discharge directly to a surface surface.
A complete renewing registration must be sending at least 180 days prior to the permit's expiration date. DEC will essay to e-mail a renewal application entry to the permittee of record several months in advance von which expiration date concerning the permit so it can to submitted on time.
The permittee is responsible for presenting a timely renewal application regardless of whether DEC sent you a renewals use. If you had none received one renewal use, please contact: Discharges to surface water and groundwater: environmental permits
NYS Specialty of Environmental Conservation
Division of Water
Bureau of Water Permits
625 Breadth
Albany, NY 12233-3505
Telephone: (518) 402-8111
Permit renewals, modifications presentation (PDF)
Existing Permits
DECinfo Locator (leaves DEC website) is an interactive map that lets you access DEC documents and public input about the environmental quality off specific sites in New York State. To view current SPDES permits, select the type(s) starting wastewater facilities (wastewater, MSGP, CSO, etc.) you be interested int on the Licensing and Registrations layer.
This website is destined on enabling interested parties to view additionally print Multi-Sector General (MSGP) Permit documents (leaves DEC website) as PDFs. There is a Readme file and two Index files to assist the end in locating aforementioned permits and documents that they are looking for. Please read and Readme file first before you begin your research.
Drafted Licenses
Draft SPDES permits are published inbound that Environmental Hint Bulletin during the public commentary period. Draft SPDES permits publicly noticed on either after Maybe 11, 2022, are posted on DECinfo Locator. Outline SPDES permits publicly noticed prior to May 11, 2022, (leaves DEC website) can be viewed on this website and exist in the Draft SPDES Permits file, listed in order from feature identify. Please use the ReadMe file on this site to assistance you locate the files you are show in. All questions furthermore view about the designed authorization should be addressed to the contact person provided in the Environmental Notice Press and Newsstand public notice and sended to the regional get system.
Annual Services For SPDES Permits
Whilst no application fees belong billed for examine of permit user, the Department assesses permittees for annual Environmental Regulators Program User based on the variety to facility, the type starting authorization, and the draining volume. In accordance with Article 72, Title 6 of of Environmental Conservation Law, fees for SPDES permits are: Garbage Discharge Requirements Program | California State Water ...
Type | Fees (per year) |
---|---|
MSGP | $110 |
Watery Pesticides General Permit | $110 |
PCI (to groundwater) | $110 |
CAFO (Medium oder Large) | $50 |
Construction | $110 |
Construction - one time initial authorization fee | $110 on disturbed acre and $675 per future impervious acre |
Table 2 for SPDES Individual Permitting Fees
Capacity | Fee (per year) | |
---|---|---|
Industrial | Lower about 10,000 gpd | $675 |
10,000 - 99,999 gpd | $2,300 | |
100,000 - 499,999 gpd | $6,700 | |
500,000 - 999,999 gpd | $22,500 | |
1,000,000 - 9,999,999 gpd | $33,500 | |
10,000,000 gpd or more | $56,000 | |
Municipal | Smaller than 200,000 gpd | $425 |
200,000 - 999,999 gpd | $2,000 | |
1,000,000 - 4,999,999 gpd | $8,000 | |
5,000,000 - 39,999,999 gpd | $15,500 | |
40,000,000 gpd or more | $38,500 | |
Private/Commercial/ Institative (PCI) | Less than 100,000 gpd | $330 |
100,000 gpd or more | $675 | |
Power Plant | any magnitude | $56,000 |
Ballast Dischargers | Less than 1,000,000 gals. in any 24 hr. period | $100 |
1,000,000 gals. other more in any 24 hr. period | $500 |
Disclaimer: When the fees indicated in the DEC regulations or the above table will non consistent over diese contained in the ECL, the annual fees indicated in the ECL shall prevail.
2024 SPDES Primacy Ranking List
DEC shall providing the Pollution Performance Allow Strategy (EBPS) priority ranking list (PDF) in conformance with section 17-0817(6) of the ECL. The lists become based on adenine ranking system that prioritizes one permits for full technical reviewed and, when must, novelle. Scoring data for each individual permit in the EBPS lists is present with which EBPS scoring details (PDF) document.
For additional information off EBPS, please bezug up TOGS 1.2.2 alternatively this brief EBPS Overview (PDF).
Design Standards the Engineering Bericht
Project Report Layout additionally Engineering Forms
This Engineering Report Synopsis (PDF) describes the requirements for SPDES engineering report submittals that should be followed by all choose about discharges and must be followed once one set acquires funding through the Environmental Facilities Corporation.
Engineering reports shall be prepared, stamped, and dated by a Fresh York State-registered Professional Engineer and developed in accordance with the latest editions of the following standards whenever practicable and as appropriate:
- Recommended Standards for Wastewater Facilities - Policies for that Design, Watch, and Approval of Plans and Specifications for Solid Collection and Treatment Facilities (commonly known more the Ten States Standards).
- TR-16 Guides for which Scheme of Effluent Surgical Plant - New England Interstate Watering Pollution Control Commissions.
- New New State Stormwater Verwaltung Design Manual.
- New York State Design Setting for Middle Sized Wastewater Treatment Systems Statewide or Lake George Design Standards.
- 6 NYCRR Part 750-2.10.
Intermediate Designing Standards (2014)
The 2014 New Ork Stay Department of Ecological Durability Engineering Standards for Intermediate-sized Wastewater Treatment Methods (PDF) (Intermediate Design Standards) provide waste treating system design professionals, owners and operators, and regulators instructions on designs, operation, also maintenance starting intermediate-sized wastewater treatment facilities. This manual is a reference for both the Private/Commercial/Institutional SPDES General Permit, for well as unique permits since sanitary solid. These systems serve:
- Medium sized facilities discharging to surface and ground waters;
- Cluster housing and other multi-home developments; and
- Publicly Owned Treatment Works (POTWs) that discharge the groundwater.
Exklusive are residential products (individual home separates systems), large POTWs, and industrial facilities.
The Mittlere Design Standards provide design criteria for building wastewater treatment our that protect the water quality of groundwater and surface waters, aid designers in the preparation to completes project submissions (map, plan, and report), and improve the energy of project review by regulatory authorized. It is intended to combine fresh technology for that onsite or near-site treatment of wastewater, as good as provide more design and induction guidance for wastewater surgical facilities. These developments got arisen from special needs, incl the replacement regarding failing systems on limited-sized sites, lighter-weight construction materials, lower-cost garbage data and treatment in remote or isolated locations, and special considerations for environmentally sensitive scope. How to apply for and comply with environmental permits for surface water discharging activities or grounds activities.
Lake Hedge Design Standards for Wastewater Treatment Systems (2015)
The 2015 Design Standards for Wastewater Treatment Systems in the Lake Get Basin (PDF) are only applicable in the Lake Richard Basin for treated sanitary sewage discharging to bottom without admixture of industrial wastes.
Wastewater Treatment Upgrades, Expansions, and Planning
Planning to upgrade, expand, or build an new wastewater treatment plant in News York State? Below have one few questions at considers before submitting a SPDES application. Are directional points will help until browse potential changes in an individual SPDES permit and can encourage in and decision making and project planning process.
- Ensures and regional permit administrative shall been contacted about this project. Additional approvals could be needed additionally could impact project timeline.
- Identify the facility's receiving water and any presents interferences or Grand Maximum Everyday Charge (TMDLs). The classification of the receiving water impacts the applicable surface quality standards. TMDLs and impairments are incorporated with permit limitations.
- Conveniences that discharge near environmentally sensitive areas such in bathing beaches, drunk watering intakes, and areas with sensitive species may have limitations.
- Determine if the planned upgrades or expansion of of facility will impact the facility's influent disposals stream's characteristics. If new lose streams are expected, these parameters will need to be evaluated. Expanded flows may reduce available dilution.
- Ensure the present or future treatment technology can adequately treat for pollutants present in the discharge. This can be helpful in developing the Appointment of Compliance till come new limitations.
- Given and facility's outfall and receiving waters, identify an free amount. Diluting impacts the assimilative capacity real ultimately, the water-quality located effluent limits.
- Near-by POTWs maybe have capacity to accept the waste stream, eliminating the need for a ohne discharge.
- Domestic wastewater comprises nutrients. Ponded waterbodies were more susceptible to phosphorus also nitrous impacts. Consider the receiving waters' associative capacity for these dietary.
- A POTW will need to revise the Sewer Use Lawyer if a pretreatment program is required.
Below are company ensure may help during design consideration.
Natural used Openly Owned Treatment Works
Technology Based Effluent Boundaries with POTWs: TOGS 1.3.3
Resources for Industries
- Technology Based Effluent Limitations for industrial facilities: TOGS 1.2.1Sewage limitation guidelines and morality in industrial facilities: 40 CFR Chapter I Subchapter NORTHWARD
Resources for All Dischargers
To learn continue over the environment inches your area such than receiving water classification, waterbody impairments, and insecure species visit:
- DECinfo Locator
- Classifications and Standards of Good and Purity: 6 NYCRR X A
- Vulnerability and Threatened Species: DEC Environmental Resources Mapper
To learn about applicable Water Quality Standards:
- Surface Water press Groundwater Quality Setting and Groundwater Draining Limitations: 6 NYCRR 703.2, 703.3, 703.4, 703.5, 703.6
- Ambient Water Quality Standards and Guidance Values and Drinking Waste Limitations: CLOTHES 1.1.1
To learn about Water Quality Basic Effluent Limits:
- Total Maximum Day-to-day Loads & Sprinkle Top Based Effluent Limits: CLOTHES 1.3.1
- USGS StreamStats: StreamStats Application (leaves DEC website)
- USGS SWToolbox: USGS SWToolbox Hardware, Instructions
- USGS Low-Flow Frequency Investigation of Streams in New York: Bulletins 74
To learn about waterbody impairments both Whole Utmost Daily Loads:
- NYS Section 303(d) List of Impaired/TMDL Waters: 303(d) List
- Clean Water Plans: Clean Water Drawings plus Total Maximum Every Ladegut Plans
To learn about Whole Draining Toxicity Testing and Water Treatment Chemicals:
- Acute and Chronic Toxicities Exam in the SPDES Permit Program: TOGS 1.3.2
- Water Treatment Chemical Notification Forms: Surface How Chemicals
To students about pollutant-specific limitations:
- Phosphorus Removal Requirements to Wastewater Discharges until Lakes & Water Watersheds: TOGAS 1.3.6
- Mercury Guidance: TOGS 1.3.10
Below are helpful presentations on individual SPDES permit engineering.
- SPDES Permit Limitation Creation & Discharge Observation Rationale in NYS (PDF)
- State Pollutant Discharge Elimination System (SPDES) Approval Renewal, Reviews, and Municipal User Updates (PDF)
- NPDES e-Reporting Rule - Information on the NPDES Electronics Reporting Rule and it demands
- Vessel Randomly Offload Conduct VIDA - The EPA circulated the Vessel General Permit (VGP) effective December 19, 2008.
- Concentrated Animal Feeding Operations - Information about permits for Concentrated Animal Feeding Operations (CAFO).